top of page

Medan Pasar, Kuala Lumpur

TaylorsLakeside-scaled-e1653011961805.jpg

Location. 

Taylors Lakeside Campus. 

project brief.

High-Rise Building at Taylor’s.

HIGH-RISE BUILDING.

In a group of 5 people, taking Block E as reference, propose the following building services systems for the high-rise building where each group member is required to individually work on the proposal which has been agreed upon:

  • mechanical ventilation system

  • air-conditioning system

  • active fire protection system

  • passive fire protection system

  • mechanical transportation system

REQUIREMENTS. A3 report

DURATION. 31 August 2022 (Week 1) - 19 October 2022 (Week 8)

building. services

final a3 report.

REFLECTION.

We were required to propose the following building services systems for the high-rise building where each group member is required to individually work on the proposal. The in-depth topics of mechanical ventilation systems, air-conditioning systems, active fire protection systems, passive fire protection systems, and mechanical transportation systems were new to me so it took me some time to catch up. However, it allowed me to further understand the service systems much better.

bottom of page