top of page

Medan Pasar, Kuala Lumpur

Surveyors Equipment

project brief.

CONSTRUCTION SOLUTIONS.

CONSTRUCTION SOLUTIONS.

​

Project 2 is based on our current studio design project to facilitate technical studies of our design. The first task we were to do deals with the analysis and establishment of the structural and the envelope systems whereas the second part required us to show in the final presentation drawings of the project, evidence of the previous studies being implemented in the design. The main drawings for this part will be the detailed sectional drawing of the design which is also one of the requirements of the design studio.​

​

REQUIREMENTS. 1 x A3 report

​

DURATION. 10 May 2022 (Week 7) - 21 June 2022 (Week 13)

advanced. architectural construction

bottom of page